NSP logo Get a Quote
NSP Projects

Installation & Commissioning

Two execution disciplines, one standard: systems and machines that start up right the first time — and keep running.

Discipline 01

System Installation & Commissioning

Complete building services systems — installed, tested, commissioned and handed over with full documentation and operator training.

  • —Medical Gas Pipeline Systems — manifold to bedside, purity and pressure tested
  • —Fire protection — hydrant, sprinkler, detection and alarm systems
  • —HVAC and ventilation — OT/ICU pressure cascades, cleanroom airflow
  • —Hot and chilled water systems, thermal oil loops and heat recovery
  • —Water, effluent and sewerage treatment plants
  • —Gas regulator metering stations — pressure regulation, slam-shut safety, metering
Oxygen manifold room commissioned by NSP
Fire sprinkler pipework installation
Blowers with acoustic silencers installed by NSP
Air-cooled chillers installed and commissioned by NSP
Discipline 02

Machine Installation & Commissioning

Heavy machinery and process equipment — set, aligned, isolated and commissioned to manufacturer specification and applicable code.

  • —Generators and power plants — base frames, vibration isolation, exhaust systems
  • —Boilers and pressure equipment — ASME BPVC compliant installation
  • —Blowers, compressors and chillers — with acoustic enclosures and silencers
  • —Hatchery incubators and poultry processing lines
  • —Medical equipment — manifold equipment, nurse call and monitoring systems
  • —Performance testing and operator handover training

Have a System or Machine to Commission?

Request a Commissioning Quote